Solar Decathlon Team Maryland

Permanent URI for this communityhttp://hdl.handle.net/1903/24706

The Solar Decathlon is a series of international competitions that challenge collegiate teams to design, build and operate solar-powered houses that are cost-effective and attractive. It is based upon an initiative of the U.S. Department of Energy (DOE), the Solar Decathlon was inaugurated in 2002.It consists of ten contests, juried or metered, with prizes for the overall three highest cumulative scores. Teams comply with competition rules, building codes, and graphic standards. Teams enter a Memorandum of Understanding with the Organizers that requires a scheduled set of deliverables. Teams may be either single institutions or a multi-institutional effort.

The Solar Decathlon has expanded internationally to include five additional worldwide competitions: Solar Decathlon Africa, Solar Decathlon China, Solar Decathlon Europe, Solar Decathlon Latin America and Caribbean, and Solar Decathlon Middle East. It is the largest sustainable building research and innovation competition in the world. Technology demonstrated at the decathlon’s have a 5-10 year lead to broad market availability and adoption.

Tens of thousands of students, educators, and industry mentors at over 500 educational institutions from nearly 60 countries on five continents have raised public awareness of the importance of renewable energy, sustainability, and energy efficiency. it has emerged as a core 20th century pedagogy for educating future engineers, architects, and ecological scientists, operating in multidisciplinary teams, to advance sustainability technology. The very scale and complexity of competing in the Solar Decathlon are essential elements in mastering sustainability competence and leadership skills development.

Team Maryland competed as a single institution in 2002, 2005, 2007, 2011, 2017. Maryland took first place overall in 2011, and first place US institutions (second place overall) in 2007 and 2017. In 2002 UMD placed 4th overall. In 2005 Maryland received the People’s Choice Award. Recognized for its record of excellence, Team Maryland has been invited to collaborate on multi-institutional teams for Solar Decathlon Europe and Solar Decathlon Africa, both held in 2019.

Browse

Search Results

Now showing 1 - 7 of 7
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-4: 90% Complete Design Drawings
    (2016-11-17) Team reACT; Johnson-Williams, Malik; Oh Boun, Sandra; Elmahadi, Alla; Rockcastle, Garth C; Binder, Michael P
    90% complete construction documentation: General, including solar envelope compliance, accessible tour route, finished square footage, water delivery and removal compliance information, and constructed footprint calculations. Site, including temporary footing locations, ground penetrations, and adjustable footings. Landscape, including plantings, containers, and watering methodology. Structural, including building, decking, and associated structures. Architectural, including dimensioned floorplans, building sections, detailed sections, reflected ceiling plans, roof plans, elevations, window and door schedules, and exterior structures. Interiors, including finishes, furniture layout, and cabinetry. Fire Protection, including sprinklers and required detection systems. Plumbing, including layout, schedules, and diagrams. Mechanical, including layout, schedules, diagrams, and installation requirements. Electrical, including AC and DC layout, 1-line diagrams, 3-line diagrams, and sizing calculations. Telecommunications, including instrumentation, wiring, and associated elements. Operations, including house transportation, assembly methodology, and staging.
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-8: As-built specifications
    (2017-08-10) Team reACT; Andros, Whitney Paige; Elmahadi, Alla; Binder, Michael P
    As-built specifications including construction specifications with sufficient detail for a residential general contractor to build without additional input from the team.
  • Item
    Solar Decathlon 2017 D-8: Complete Cost Analysis
    (2017-08-10) Team reACT; Andros, Whitney Paige; Rockcastle, Garth C; Binder, Michael P
    The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness with regard to meeting team and design goals.
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-7: Construction Sequence Animation
    (2017-04-27) Team reACT; Goldstein, Gregory; Rockcastle, Garth C
    Animation of how the house was constructed and moved to the exhibition site in Denver, Colorado. The U.S. Department of Energy Solar Decathlon 2017 teams must develop and implement communications strategies to engage their local communities, provide free tours to visitors during the event in Denver, and make an impact across the world through their digital presence and media outreach.
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-7: Construction Photography
    (2017-04-27) Team reACT; Habib, Sophie; Machado, Christiane; Schrantz, Emma; Binder, Michael P
    Photographic documentation of the construction process, still images. The U.S. Department of Energy Solar Decathlon 2017 teams must develop and implement communications strategies to engage their local communities, provide free tours to visitors during the event in Denver, and make an impact across the world through their digital presence and media outreach.
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-6: Environment, Health & Safety Plan (EHSP)
    (2017-02-23) Team reACT; Habib, Sophie; Binder, Michael P; Rockcastle, Garth C
    Identifies the following elements: Risk minimization, address major hazards that may be encountered during assembly and disassembly activities on the competition site, injury prevention to team and crew members, volunteers, subcontractors, organizers, and the public, identify areas of high risk and include descriptions in necessary level of detail to ensure the health and safety of all site personnel, compliance with applicable regulations and the roles and responsibilities for the Team’s core supervisory personnel (Project Manager, Construction Manager and Health and Safety Officer(s)) during competition.
  • Thumbnail Image
    Item
    Solar Decathlon 2017 D-6: reACT Final Construction Drawings
    (2017-02-23) Team reACT; Oh Boun, Sandra; Johnson-Williams, Malik; Rockcastle, Garth C; Adomaitis, Raymond A
    100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and final design details, house system specifications, and construction.