Solar Decathlon 2017 D-6: reACT Final Construction Drawings
Solar Decathlon 2017 D-6: reACT Final Construction Drawings
Loading...
Files
Publication or External Link
Date
2017-02-23
Citation
DRUM DOI
Abstract
100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and final design details, house system specifications, and construction.
Notes
92 pages, architectural plans