Solar Decathlon 2017 D-8: Complete Cost Analysis
Solar Decathlon 2017 D-8: Complete Cost Analysis
No Thumbnail Available
Files
Publication or External Link
Date
2017-08-10
Advisor
Citation
DRUM DOI
Abstract
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness with regard to meeting team and design goals.
Notes
Spreadsheet with 4 tabs