Solar Decathlon 2017 D-8: As-built drawings
dc.contributor.advisor | Rockcastle, Garth C | |
dc.contributor.advisor | Binder, Michael P | |
dc.contributor.author | Team reACT | |
dc.contributor.author | Oh Boun, Sandra | |
dc.contributor.author | Johnson-Williams, Malik | |
dc.contributor.author | Goldstein, Gregory | |
dc.date.accessioned | 2019-09-19T20:07:12Z | |
dc.date.available | 2019-09-19T20:07:12Z | |
dc.date.issued | 2017-08-10 | |
dc.description | As-built drawings of the team's Solar Decathlon project | |
dc.description.abstract | Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary to construct the competition prototype. Pricing is based on the following hierarchy of sources: a. RS Means Cost Guides for the current year (current year and adjusted to the national average location factor, wage rate, and average material index); b. Distributor pricing, with labor added; c. Web-based materials search, with labor added; d. Estimator’s experience. | |
dc.description.sponsorship | A. James Clark School of Engineering | |
dc.description.sponsorship | School of Architecture, Planning and Preservation | |
dc.description.sponsorship | University Libraries | |
dc.identifier | https://doi.org/10.13016/moai-rqsf | |
dc.identifier.uri | http://hdl.handle.net/1903/24869 | |
dc.language.iso | en_US | |
dc.relation.ispartofseries | D-8: Jury Deliverables | |
dc.subject | solar decathlon | |
dc.subject | cost analysis | |
dc.subject | construction specifications | |
dc.title | Solar Decathlon 2017 D-8: As-built drawings |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- UMD_D8_Construction_Drawings_2017_08_10.pdf
- Size:
- 18.22 MB
- Format:
- Adobe Portable Document Format
- Description: