Solar Decathlon 2017 D-8: As-built drawings

dc.contributor.advisorRockcastle, Garth C
dc.contributor.advisorBinder, Michael P
dc.contributor.authorTeam reACT
dc.contributor.authorOh Boun, Sandra
dc.contributor.authorJohnson-Williams, Malik
dc.contributor.authorGoldstein, Gregory
dc.date.accessioned2019-09-19T20:07:12Z
dc.date.available2019-09-19T20:07:12Z
dc.date.issued2017-08-10
dc.descriptionAs-built drawings of the team's Solar Decathlon project
dc.description.abstractReviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary to construct the competition prototype. Pricing is based on the following hierarchy of sources: a. RS Means Cost Guides for the current year (current year and adjusted to the national average location factor, wage rate, and average material index); b. Distributor pricing, with labor added; c. Web-based materials search, with labor added; d. Estimator’s experience.
dc.description.sponsorshipA. James Clark School of Engineering
dc.description.sponsorshipSchool of Architecture, Planning and Preservation
dc.description.sponsorshipUniversity Libraries
dc.identifierhttps://doi.org/10.13016/moai-rqsf
dc.identifier.urihttp://hdl.handle.net/1903/24869
dc.language.isoen_US
dc.relation.ispartofseriesD-8: Jury Deliverables
dc.subjectsolar decathlon
dc.subjectcost analysis
dc.subjectconstruction specifications
dc.titleSolar Decathlon 2017 D-8: As-built drawings

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
UMD_D8_Construction_Drawings_2017_08_10.pdf
Size:
18.22 MB
Format:
Adobe Portable Document Format
Description: