Browsing by Author "Johnson-Williams, Malik"
Now showing 1 - 7 of 7
Results Per Page
Sort Options
Item Solar Decathlon 2017 D-4: 90% Complete Design Drawings(2016-11-17) Team reACT; Johnson-Williams, Malik; Oh Boun, Sandra; Elmahadi, Alla; Rockcastle, Garth C; Binder, Michael P90% complete construction documentation: General, including solar envelope compliance, accessible tour route, finished square footage, water delivery and removal compliance information, and constructed footprint calculations. Site, including temporary footing locations, ground penetrations, and adjustable footings. Landscape, including plantings, containers, and watering methodology. Structural, including building, decking, and associated structures. Architectural, including dimensioned floorplans, building sections, detailed sections, reflected ceiling plans, roof plans, elevations, window and door schedules, and exterior structures. Interiors, including finishes, furniture layout, and cabinetry. Fire Protection, including sprinklers and required detection systems. Plumbing, including layout, schedules, and diagrams. Mechanical, including layout, schedules, diagrams, and installation requirements. Electrical, including AC and DC layout, 1-line diagrams, 3-line diagrams, and sizing calculations. Telecommunications, including instrumentation, wiring, and associated elements. Operations, including house transportation, assembly methodology, and staging.Item Solar Decathlon 2017 D-5: 3-D Walk-Through(2016-12-15) Team reACT; Johnson-Williams, Malik; Southard, Renata; Zain, Shah; Rockcastle, Garth CAnimated walkthrough created from architectural renderings to date. This was used by the U.S. Department of Energy Solar Decathlon 2017 as part of their media package. Team Maryland used it for various outreach and fundraising events.Item Solar Decathlon 2017 D-5: Architectural Renderings(2016-12-15) Team reACT; Johnson-Williams, Malik; Southard, Renata; Moore, Anil; Rockcastle, Garth C; Binder, Michael PImages, with exterior, interior, and birds-eye views, includes a .docx file with photographer credits.Item Solar Decathlon 2017 D-6: reACT Final Construction Drawings(2017-02-23) Team reACT; Oh Boun, Sandra; Johnson-Williams, Malik; Rockcastle, Garth C; Adomaitis, Raymond A100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and final design details, house system specifications, and construction.Item Solar Decathlon 2017 D-8: As-built drawings(2017-08-10) Team reACT; Oh Boun, Sandra; Johnson-Williams, Malik; Goldstein, Gregory; Rockcastle, Garth C; Binder, Michael PReviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary to construct the competition prototype. Pricing is based on the following hierarchy of sources: a. RS Means Cost Guides for the current year (current year and adjusted to the national average location factor, wage rate, and average material index); b. Distributor pricing, with labor added; c. Web-based materials search, with labor added; d. Estimator’s experience.Item Solar Decathlon 2017 D-8: Audiovisual presentation(2017-08-10) Team reACT; Fairhurst, Ricky; Oh Boun, Sandra; Johnson-Williams, Malik; Rockcastle, Garth CAudiovisual presentation including a realistic video walkthrough of the complete constructed house as built prior to competition, audio narrative explaining the underlying philosophy behind the design and team approach, still photos and graphics. Includes an audio narrative and transcript that explains to viewers what they’re seeing and describes the underlying philosophy behind the design and team approach to the competition.Item Solar Decathlon 2017 D-9: Final Report(2017-11-16) Team reACT; Habib, Sophie; Elmahadi, Alla; Johnson-Williams, Malik; Cossard, Patricia Kosco; Rockcastle, Garth C; Binder, Michael P; Adomaitis, Raymond AImpact statement, including: summary of fundraising activities, final project budget, results of media-outreach activities (statistics), results of on-site exhibition activities, estimates of the number of visitors, assessment of visitor experiences,evaluation of the team’s online presence, including statistics, team perspective on the effectiveness of the organizers, future plans for the house, and team officer’s future employment or educational plans.