Solar Decathlon 2017 D-8: As-built drawings

Loading...
Thumbnail Image

Publication or External Link

Advisor

Rockcastle, Garth C
Binder, Michael P

Citation

Abstract

Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary to construct the competition prototype. Pricing is based on the following hierarchy of sources: a. RS Means Cost Guides for the current year (current year and adjusted to the national average location factor, wage rate, and average material index); b. Distributor pricing, with labor added; c. Web-based materials search, with labor added; d. Estimator’s experience.

Notes

As-built drawings of the team's Solar Decathlon project

Rights