Infrastructure for Stormwater Flooding Mitigation in Edmonston Maryland
| dc.contributor.advisor | Izursa, Jose-Luis | |
| dc.contributor.author | Acho, Tafor | |
| dc.contributor.author | Amster, Jacob | |
| dc.contributor.author | Anwar, Muqarib Tahir | |
| dc.contributor.author | Berezina, Masha | |
| dc.contributor.author | Chowdhury, Jishan | |
| dc.contributor.author | Diggs, Cai | |
| dc.contributor.author | Ellison, Louisa | |
| dc.contributor.author | Hadaegh, Aryan | |
| dc.contributor.author | Johnson, Hannah | |
| dc.contributor.author | Marlowe, Josh | |
| dc.contributor.author | McDermott, John | |
| dc.contributor.author | Wahl, Isabella | |
| dc.date.accessioned | 2026-10-26T16:17:33Z | |
| dc.date.issued | 2025-05 | |
| dc.description | Final report for ENST481: Ecological Design (Spring 2025). University of Maryland, College Park | |
| dc.description.abstract | This project focuses on ecological design solutions for flooding and water pollution in Edmonston, Maryland. There are three student group reports, each describing a different stormwater solution. The first report proposes permeable interlocking concrete pavement (PICP) to mitigate flash flooding, detailing its design, cost, and effectiveness based on small-scale prototyping. The second investigates the feasibility of French drain systems for stormwater management, outlining a modular design, cost analysis, and retention capabilities for a specific flood-prone street. Finally, the third report analyzes a phytoremediation box designed to reduce salt and nutrient pollutants in urban runoff, discussing its conceptual basis, experimental setup, and the challenges faced during initial testing. | |
| dc.description.sponsorship | Prince George's County, MD | |
| dc.identifier | https://doi.org/10.13016/co4l-tso2 | |
| dc.identifier.uri | http://hdl.handle.net/1903/36103 | |
| dc.publisher | Partnership for Action Learning Sustainability (PALS) | |
| dc.subject | School of Architecture, Planning, and Preservation | |
| dc.subject | MAPP | |
| dc.subject | National Center for Smart Growth | |
| dc.subject | PALS | |
| dc.subject | Town of Edmonston | |
| dc.subject | Prince George's County | |
| dc.subject | Edmonston, MD | |
| dc.subject | College of Agriculture and Natural Resources | |
| dc.subject | AGNR | |
| dc.subject | Environmental Science & Technology Program | |
| dc.subject | ENST | |
| dc.subject | Spring 2025 | |
| dc.subject | Jose-Luis Izursa | |
| dc.subject | ENST481: Ecological Design | |
| dc.subject | Stormwater | |
| dc.subject | Flooding | |
| dc.subject | Ecological Design | |
| dc.title | Infrastructure for Stormwater Flooding Mitigation in Edmonston Maryland | |
| dc.type | Report | |
| local.equitableAccessSubmission | No |
Files
Original bundle
1 - 3 of 3
Loading...
- Name:
- 25SS_ENST481_Group1_FinalReport_POST.pdf
- Size:
- 5.47 MB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 25SS_ENST481_Group2_FinalReport_POST.pdf
- Size:
- 1.31 MB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 25SS_ENST481_Group3_FinalReport_POST.pdf
- Size:
- 709.58 KB
- Format:
- Adobe Portable Document Format