Heuristic Optimization of Rough-Mill Yield with Production Priorities
dc.contributor.author | Azarm, Shapour | en_US |
dc.contributor.author | Harhalakis, George | en_US |
dc.contributor.author | Srinivasan, M. | en_US |
dc.contributor.author | Statton, P., Jr. | en_US |
dc.contributor.department | ISR | en_US |
dc.date.accessioned | 2007-05-23T09:46:26Z | |
dc.date.available | 2007-05-23T09:46:26Z | |
dc.date.issued | 1990 | en_US |
dc.description.abstract | Efficient lumber utilization at the saw has become a key issue in the woodworking industry. This is because of shrinking supply and increasing raw material prices. In this paper, formulation of the cross-cut first method of cutting defects out of lumber, as a one-dimensional stock cutting problem is discussed. A Monte-Carlo simulation method has been used for generating boards of a given grade. This simulation greatly aids in comparing alternate solution procedures proposed in the paper. To facilitate real- time application, a fast heuristic for the digital computer is introduced. This is followed by a discussion of cutting length priority allocation. The heuristic solution is compared with the optimal solution obtained using Kolesar's knapsack algorithm. | en_US |
dc.format.extent | 1238170 bytes | |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | http://hdl.handle.net/1903/5017 | |
dc.language.iso | en_US | en_US |
dc.relation.ispartofseries | ISR; TR 1990-69 | en_US |
dc.subject | Manufacturing Systems | en_US |
dc.title | Heuristic Optimization of Rough-Mill Yield with Production Priorities | en_US |
dc.type | Technical Report | en_US |
Files
Original bundle
1 - 1 of 1