Solar Decathlon 2017 D-8: Complete Cost Analysis
View/ Open
Date
2017-08-10Author
Team reACT
Andros, Whitney Paige
Rockcastle, Garth C
Binder, Michael P
DRUM DOI
Metadata
Show full item recordAbstract
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness with regard to meeting team and design goals.
Notes
Spreadsheet with 4 tabs