<link rel="stylesheet" href="styles.cf390c6bfbe7555f.css">

Estimation of Setup Time for Machined Parts: Accounting for Work-Holding Constraints

Loading...
Thumbnail Image

Files

TR_95-13.pdf (1.17 MB)
No. of downloads: 818

Publication or External Link

External Link to Data Files

Date

Advisor

Citation

DRUM DOI

Abstract

For machined parts, setup time is a major component of the total time required to create a machined part. If the setup time can be reduced, this will not only decrease the machining time, but will also ensure better machining accuracy, require fewer work- holding devices and increase machine usage time.

To achieve any improvement in setup time, first we need to estimate the setup time accurately. In this paper we propose a methodology to estimate the setup time for machining prismatic parts in a three axis vertical machining center. We consider three major factors in estimating the number of setups, namely---the precedence constraints among machining operations, the feasibility of work holding using vise clamping, and the availability of datum faces for locating the workpiece.

Notes

Rights

Endorsement

Review

Supplemented By

Referenced By