RECONSTRUCTION OF A DOWNTOWN: THE AFTERMATH OF THE GREAT BALTIMORE FIRE OF 1904

dc.contributor.advisorGroves, Paul
dc.contributor.authorWingo, Amanda Jean
dc.contributor.departmentGeography
dc.contributor.publisherDigital Repository at the University of Maryland
dc.contributor.publisherUniversity of Maryland (College Park, Md)
dc.date.accessioned2015-07-21T18:36:02Z
dc.date.available2015-07-21T18:36:02Z
dc.date.issued1993
dc.description.abstractReconstruction following a major disaster has farreaching impacts which can alter the functioning of a city. Understanding this process is therefore vital. The results of such a study add to the small body of literature on reconstruction following disaster and thus provides additional testing of the findings of Bowden(l967), the critical piece of literature on reconstruction to date. Specifically, this thesis considers the process of reconstruction by looking at the structural and spatial changes predicted by one catastrophic event. Using both Sanborn Atlases and Baltimore Business Directories between 1902 and 1914, the Central Business District (CBD) is examined through the analysis of concentration, sequencing, and persistence processes. More important, however, is the extent to which these processes impact the spatial characteristics of establishments within the Burnt District over a specific period of time (1902- --- ·--·-- 1914). A significant finding indicates that in the pre- and post-fire period Baltimore maintains a high degree of consistency within the Burnt District. However 1 the vertical dimension of Baltimore changes drastically from 1902 to 1914 allowing an increase in the availability of space explained by the vertical growth of buildings. The sequence of return of the "building block" establishments occurred within a surprising two years following the fire. Several defining situations fix or anchor establishments to their locations 1 which act to mitigate the variations in land-use patterns over time. The findings of this study provide a spatial view of the functional districts which play an important role in the life of the CBD of Baltimore.en_US
dc.identifierhttps://doi.org/10.13016/M2C04K
dc.identifier.otherILLiad # 904481
dc.identifier.urihttp://hdl.handle.net/1903/16843
dc.language.isoen_USen_US
dc.titleRECONSTRUCTION OF A DOWNTOWN: THE AFTERMATH OF THE GREAT BALTIMORE FIRE OF 1904en_US
dc.typeThesisen_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
904481.pdf
Size:
4.71 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.57 KB
Format:
Item-specific license agreed upon to submission
Description: