Sequencing Wafer Handler Moves to Improve the Performance of Hybrid Cluster Tools
dc.contributor.author | Nguyen, Manh-Quan T. | en_US |
dc.contributor.author | Herrmann, Jeffrey W. | en_US |
dc.contributor.department | ISR | en_US |
dc.date.accessioned | 2007-05-23T10:09:23Z | |
dc.date.available | 2007-05-23T10:09:23Z | |
dc.date.issued | 2000 | en_US |
dc.description.abstract | Cluster tools are highly integrated machines that can perform a sequence of semiconductor manufacturing processes. The sequence of wafer handler moves affects the total time needed to process a set of wafers.<p> Reducing this time can reduce cycle time, reduce tool utilization, and increase tool capacity. This paper introduces the cluster tool scheduling problem for hybrid cluster tools, which are multiple-stage tools that have at least one stage with two or more parallel chambers. <p>This paper presents algorithms that can find superior sequences of wafer handler moves. Experimental results show that the tool performance can be improved significantly if the wafer handler follows a cyclic sequence instead of using a dispatching rule. | en_US |
dc.format.extent | 400022 bytes | |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | http://hdl.handle.net/1903/6134 | |
dc.language.iso | en_US | en_US |
dc.relation.ispartofseries | ISR; TR 2000-31 | en_US |
dc.subject | computer integrated manufacturing CIM | en_US |
dc.subject | flexible manufacturing | en_US |
dc.subject | manufacturing | en_US |
dc.subject | cluster tools | en_US |
dc.subject | scheduling | en_US |
dc.subject | semiconductor manufacturing, | en_US |
dc.title | Sequencing Wafer Handler Moves to Improve the Performance of Hybrid Cluster Tools | en_US |
dc.type | Technical Report | en_US |
Files
Original bundle
1 - 1 of 1