Civil & Environmental Engineering Research Works
Permanent URI for this collectionhttp://hdl.handle.net/1903/1657
Browse
3 results
Search Results
Item Assessing the performance of polyphosphate accumulating organisms in a full-scale side-stream enhanced biological phosphorous removal(Wiley, 2024-01-11) Aghilinasrollahabadi, Khashayar; Ghandehari, Shahrzad Saffari; Kjellerup, Birthe Veno; Nguyen, Caroline; Saavedra, Yerman; Li, GuangbinPhosphorous (P) removal in wastewater treatment is essential to prevent eutrophication in water bodies. Side-stream enhanced biological phosphorous removal (S2EBPR) is utilized to improve biological P removal by recirculating internal streams within a side-stream reactor to generate biodegradable carbon (C) for polyphosphate accumulating organisms (PAOs). In this study, a full-scale S2EBPR system in a water resource recovery facility (WRRF) was evaluated for 5 months. Batch experiments revealed a strong positive correlation (r = 0.91) between temperature and C consumption rate (3.56–8.18 mg-COD/g-VSS/h) in the system, with temperature ranging from 14°C to 18°C. The anaerobic P-release to COD-uptake ratio decreased from 0.93 to 0.25 mg-P/mg-COD as the temperature increased, suggesting competition between PAOs and other C-consumers, such as heterotrophic microorganisms, to uptake bioavailable C. Microbial community analysis did not show a strong relationship between abundance and activity of PAO in the tested WRRF. An assessment of the economic feasibility was performed to compare the costs and benefits of a full scale WRRF with and without implementation of the S2EBPR technology. The results showed the higher capital costs required for S2EBPR were estimated to be compensated after 5 and 11 years of operation, respectively, compared to chemical precipitation and conventional EBPR. The results from this study can assist in the decision-making process for upgrading a conventional EBPR or chemical P removal process to S2EBPR.Item Ensuring the continued success of a mulch biowall at a trichloroethylene-contaminated superfund site: Lessons learned(Wiley, 2023-08-03) Ghandehari, Shahrzad Saffari; Cheng, Shih-Huai; Hapeman, Cathleen J.; Torrents, Alba; Kjellerup, Birthe VenoTrichloroethylene (TCE) is a toxic organic compound, which can adversely affect human health. The chemical is one of the most frequently found contaminants in groundwater in the United States and around the world. A landfill in Maryland contaminated with high levels of TCE decades ago was added to the U.S. Environmental Protection Agency's National Priority List (NPL) in 1994. A biowall was installed on the site in 2013 to promote the bioremediation of TCE and subsequently of its degradation products. Six-year monitoring data indicated a steady removal of >99% groundwater TCE at the wall since installation. However, a concurrent buildup of intermediate byproducts was observed downgradient of the wall. An examination of the entire system was necessary to find the reason behind the inefficiency of the biowall. In this study, the background of the site, remediation plan, and installation were assessed. Monitoring data, including the concentration of TCE and its degradation byproducts, and geochemical and physical characteristics were evaluated to understand the conditions and challenges facing decision-makers of this project and possible options to improve biowall efficacy.Item Elimination of Bloodstream Infections Associated with Candida albicans Biofilm in Intravascular Catheters(MDPI, 2015-06-29) Akbari, Freshta; Kjellerup, Birthe VenoIntravascular catheters are among the most commonly inserted medical devices and they are known to cause a large number of catheter related bloodstream infections (BSIs). Biofilms are associated with many chronic infections due to the aggregation of microorganisms. One of these organisms is the fungus Candida albicans. It has shown to be one of the leading causes of catheter-related BSIs. The presence of biofilm on intravascular catheters provide increased tolerance against antimicrobial treatments, thus alternative treatment strategies are sought. Traditionally, many strategies, such as application of combined antimicrobials, addition of antifungals, and removal of catheters, have been practiced, but they were not successful in eradicating BSIs. Since these fungal infections can result in significant morbidity, mortality, and increased healthcare cost, other promising preventive strategies, including antimicrobial lock therapy, chelating agents, alcohol, and biofilm disruptors, have been applied. In this review, current success and failure of these new approaches, and a comparison with the previous strategies are discussed in order to understand which preventative treatment is the most effective in controlling the catheter-related BSIs.