Watershed Restoration Prioritization Project

dc.contributor.advisorWeaver, Kathy
dc.contributor.authorMathias, Sheryl
dc.contributor.authorZhang, Binguan
dc.contributor.authorZhang, Xinyun
dc.date.accessioned2018-09-11T18:47:54Z
dc.date.available2018-09-11T18:47:54Z
dc.date.issued2018
dc.descriptionFinal project for INFM 737: Information Management Capstone Experience (Spring 2018). University of Maryland, College Park.en_US
dc.description.abstractThe goal is to serve DoE’s mission to improve water quality and satisfy the Federal Mandate to meet the National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) requirement of reducing nitrogen, phosphorus, and sediment in Prince George’s watersheds by 2025. The requirement is set by the EPA. Currently design teams select projects on a site by site basis, based on information sources such as SharePoint, MS Project, PGAtlas and field study. There is no existing visualization or scoring tool that prioritizes projects based on how much nitrogen, phosphorus, and sediment is produced in an area. This project’s objective is to prioritize areas for restoration based on the amount of pollutants a site is producing, thus saving energy, effort, time, and making the process more cost effective.en_US
dc.description.sponsorshipPrince George's Countyen_US
dc.identifierhttps://doi.org/10.13016/M23B5WC0M
dc.identifier.urihttp://hdl.handle.net/1903/21192
dc.language.isoen_USen_US
dc.publisherPartnership for Action Learning in Sustainability (PALS)
dc.relation.isAvailableAtDigital Repository at the University of Marylanden_us
dc.relation.isAvailableAtUniversity of Maryland (College Park, Md)en_us
dc.titleWatershed Restoration Prioritization Projecten_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Watershed Restoration Prioritization Project.pptx
Size:
3.07 MB
Format:
Microsoft PowerPoint 2007 Presentation
Description: