Skip to content
University of Maryland LibrariesDigital Repository at the University of Maryland
    • Login
    View Item 
    •   DRUM
    • A. James Clark School of Engineering
    • Institute for Systems Research Technical Reports
    • View Item
    •   DRUM
    • A. James Clark School of Engineering
    • Institute for Systems Research Technical Reports
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Integrated Manufacturing Facility Design

    Thumbnail
    View/Open
    PhD_95-7.pdf (8.505Mb)
    No. of downloads: 483

    Date
    1995
    Author
    Ioannou, George
    Advisor
    Minis, I.
    Metadata
    Show full item record
    Abstract
    This dissertation addresses for the first time the integrated problem of designing the manufacturing shop layout concurrently with its material handling system. Specifically, this study provides a method to derive shop designs that are economic to set up and efficient to operate. In doing so, it considers the following highly interrelated issues: i) The topology of the material flow network, ii) the transporter fleet size and routing, and iii) the layout of the resource groups on the shop floor. The design problem is modeled by a comprehensive mathematical program which captures critical practical concerns such as investment and operational costs, traffic congestion, and transporter capacities. The model is decomposed into three NP- hard subproblems by fixing and/or aggregating variables and constraints. The first subproblem is the generic multi-commodity fixed charge capacitated network design, for which an improved lower bound is derived based on a dual ascent method. This problem is solved by three heuristics that provide near-optimal network designs. The second subproblem concerns the transporter routing, which is a special case of the distance-constrained vehicle routing problem. For the transporter routing problem near-optimal solutions are derived in polynomial time by two efficient heuristics with bounded worst-case performance. Tight lower bounds are provided by solutions to the assignment problem. An integrated method combines the most effective heuristics for the material handling system design subproblems with a simulated annealing scheme to solve the global shop design problem. Our novel approach addresses simultaneously most major decisions involved in manufacturing shop design, and provides globally near optimal solutions. The method is applied to the redesign of the shop of a large manufacturer, and generates a particularly attractive production system design reducing significantly both investment and operational costs, while providing for smooth system operation.
    URI
    http://hdl.handle.net/1903/5697
    Collections
    • Institute for Systems Research Technical Reports

    DRUM is brought to you by the University of Maryland Libraries
    University of Maryland, College Park, MD 20742-7011 (301)314-1328.
    Please send us your comments.
    Web Accessibility
     

     

    Browse

    All of DRUMCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister
    Pages
    About DRUMAbout Download Statistics

    DRUM is brought to you by the University of Maryland Libraries
    University of Maryland, College Park, MD 20742-7011 (301)314-1328.
    Please send us your comments.
    Web Accessibility