Solar Decathlon 2017 D-8: As-built drawings

View/ Open
Date
2017-08-10Author
Team reACT
Oh Boun, Sandra
Johnson-Williams, Malik
Goldstein, Gregory
Advisor
Rockcastle, Garth C
Binder, Michael P
DRUM DOI
Metadata
Show full item recordAbstract
Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary to construct the competition prototype. Pricing is based on the following hierarchy of sources: a. RS Means Cost Guides for the current year (current year and adjusted to the national average location factor, wage rate, and average material index); b. Distributor pricing, with labor added; c. Web-based materials search, with labor added; d. Estimator’s experience.
Notes
As-built drawings of the team's Solar Decathlon project