Search
Now showing items 1-3 of 3
Solar Decathlon 2017 D-4: Design Specifications
(2016-11-17)
Construction Specifications, details of all material to be used in construction and their compliance with the appropriate Building codes.
Solar Decathlon 2017 D-8: As-built drawings
(2017-08-10)
Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary ...
Solar Decathlon 2017 D-8: As-built specifications
(2017-08-10)
As-built specifications including construction specifications with sufficient detail for a residential general contractor to build without additional input from the team.