Search
Now showing items 1-10 of 34
Solar Decathlon 2017 D-7: Exhibition Plan
(2017-04-27)
Design of onsite signage, team handout, digital displays, or other products intended to convey information to the public, plan depicting location of all public exhibit materials, and team website and/or social media ...
Solar Decathlon 2017 D-5: 3-D Walk-Through
(2016-12-15)
Animated walkthrough created from architectural renderings to date. This was used by the U.S. Department of Energy Solar Decathlon 2017 as part of their media package. Team Maryland used it for various outreach and ...
Solar Decathlon 2017 D-5: Architectural Renderings
(2016-12-15)
Images, with exterior, interior, and birds-eye views, includes a .docx file with photographer credits.
Solar Decathlon 2017 D-7: Team reACT Video
(2017-04-27)
Audiovisual presentation of walk-through of reACT as will be experienced by judges and by the general public. The U.S. Department of Energy Solar Decathlon 2017 teams must develop and implement communications strategies ...
Solar Decathlon 2017 D-8: Complete Cost Analysis
(2017-08-10)
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness ...
Solar Decathlon 2017 D-4: 90% Complete Design Drawings
(2016-11-17)
90% complete construction documentation: General, including solar envelope compliance, accessible tour route, finished square footage, water delivery and removal compliance information, and constructed footprint calculations. ...
Solar Decathlon 2017 D-8: Market Potential Narrative
(2017-08-10)
Market Potential including how the design and integrated design elements positively impact the U.S. residential energy efficiency and renewable energy industry, demonstrate exterior and interior appeal for Native Americans ...
Solar Decathlon 2017 D-8: Innovations Narrative
(2017-08-10)
This report describes the team’s approach to innovation, from design to execution. It includes details on how and what research was conducted and how it informed decisions on design solutions. It discusses how the team ...
Solar Decathlon 2017 D-4: Project Manual
(2016-11-17)
Project Overview. Detailed Water Budget. Interconnection Information Form, including summary of any unlisted electrical components. Summary of reconfigurable features. Health and Safety Approach. Energy Analysis and Model.
Solar Decathlon 2017 D-7: Floor Plan
(2017-04-27)
The graphic floor plan is expected to be posted to the Solar Decathlon website and used in various communications materials to introduce the public to each competition prototype. The floor plan should be presented in a way ...