Search
Now showing items 1-7 of 7
Solar Decathlon 2017 D-5: 3-D Walk-Through
(2016-12-15)
Animated walkthrough created from architectural renderings to date. This was used by the U.S. Department of Energy Solar Decathlon 2017 as part of their media package. Team Maryland used it for various outreach and ...
Solar Decathlon 2017 D-5: Architectural Renderings
(2016-12-15)
Images, with exterior, interior, and birds-eye views, includes a .docx file with photographer credits.
Solar Decathlon 2017 D-4: 90% Complete Design Drawings
(2016-11-17)
90% complete construction documentation: General, including solar envelope compliance, accessible tour route, finished square footage, water delivery and removal compliance information, and constructed footprint calculations. ...
Solar Decathlon 2017 D-8: As-built drawings
(2017-08-10)
Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary ...
Solar Decathlon 2017 D-6: reACT Final Construction Drawings
(2017-02-23)
100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and ...
Solar Decathlon 2017 D-9: Final Report
(2017-11-16)
Impact statement, including: summary of fundraising activities, final project budget, results of media-outreach activities (statistics), results of on-site exhibition activities, estimates of the number of visitors, ...
Solar Decathlon 2017 D-8: Audiovisual presentation
(2017-08-10)
Audiovisual presentation including a realistic video walkthrough of the complete constructed house as built prior to competition, audio narrative explaining the underlying philosophy behind the design and team approach, ...