Solar Decathlon 2017 D-8: Complete Cost Analysis
(2017-08-10)
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness ...
Solar Decathlon 2017 D-8: As-built drawings
(2017-08-10)
Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary ...
Solar Decathlon 2017 D-6: reACT Project Manual
(2017-02-23)
Project Manual includes the project overview, detailed water budget, summary of unlisted electrical components and reconfigurable features, complete energy analysis and model, construction specifications, draft cost estimate, ...