Solar Decathlon 2017 D-8: Complete Cost Analysis
(2017-08-10)
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness ...
Solar Decathlon 2017 D-7: Construction Sequence Animation
(2017-04-27)
Animation of how the house was constructed and moved to the exhibition site in Denver, Colorado. The U.S. Department of Energy Solar Decathlon 2017 teams must develop and implement communications strategies to engage their ...
Solar Decathlon 2017 D-6: reACT Final Construction Drawings
(2017-02-23)
100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and ...
Solar Decathlon 2017 D-6: Environment, Health & Safety Plan (EHSP)
(2017-02-23)
Identifies the following elements: Risk minimization, address major hazards that may be encountered during assembly and disassembly activities on the competition site, injury prevention to team and crew members, volunteers, ...
Solar Decathlon 2017 D-7: Construction Photography
(2017-04-27)
Photographic documentation of the construction process, still images. The U.S. Department of Energy Solar Decathlon 2017 teams must develop and implement communications strategies to engage their local communities, provide ...
Solar Decathlon 2017 D-8: As-built specifications
(2017-08-10)
As-built specifications including construction specifications with sufficient detail for a residential general contractor to build without additional input from the team.