Search
Now showing items 1-4 of 4
Solar Decathlon 2017 D-8: As-built drawings
(2017-08-10)
Reviewed by a professional cost estimator, this documents the exact estimated construction cost based on the as-built construction documentation. Cost estimates include all labor, material, and equipment costs necessary ...
Solar Decathlon 2017 D-6: reACT Final Construction Drawings
(2017-02-23)
100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and ...
Solar Decathlon 2017 D-9: Final Report
(2017-11-16)
Impact statement, including: summary of fundraising activities, final project budget, results of media-outreach activities (statistics), results of on-site exhibition activities, estimates of the number of visitors, ...
Solar Decathlon 2017 D-8: Audiovisual presentation
(2017-08-10)
Audiovisual presentation including a realistic video walkthrough of the complete constructed house as built prior to competition, audio narrative explaining the underlying philosophy behind the design and team approach, ...