Search
Now showing items 1-2 of 2
Solar Decathlon 2017 D-6: reACT Final Construction Drawings
(2017-02-23)
100% complete construction documentation, with sufficient detail for a contractor to build the competition prototype house as it is expected to appear on the competition site. The documentation shall include complete and ...
Solar Decathlon 2017 D-8: Audiovisual presentation
(2017-08-10)
Audiovisual presentation including a realistic video walkthrough of the complete constructed house as built prior to competition, audio narrative explaining the underlying philosophy behind the design and team approach, ...