Solar Decathlon 2017 D-4: Project Manual
(2016-11-17)
Project Overview. Detailed Water Budget. Interconnection Information Form, including summary of any unlisted electrical components. Summary of reconfigurable features. Health and Safety Approach. Energy Analysis and Model.
Solar Decathlon 2017 D-4: Design Specifications
(2016-11-17)
Construction Specifications, details of all material to be used in construction and their compliance with the appropriate Building codes.
Solar Decathlon 2017 D-3: Team Overview To Date
(2016-09-15)
Updated 100-word description of team and its goals (second iteration); Digital representation (renderings, graphic floor plan, photography of scale model, animation, etc.) of competition prototype design; Team photograph; ...