Search
Now showing items 1-6 of 6
Solar Decathlon 2017 D-8: Complete Cost Analysis
(2017-08-10)
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness ...
Solar Decathlon 2017 D-1: Project Management Plan
(2016-03-31)
Project Management Plan that outlines your team structure, approach to the competition, general work schedule (including plan for continued progress over the summer of 2016), course integration, and fundraising schedules.
Solar Decathlon 2017 D-8: Architectural Narrative
(2017-08-27)
Architectural Concept and Design Approach including, overall clear concept, idea or ideas to guide the development of the whole design process, design solution and competition prototype house demonstrate overall coherence ...
Solar Decathlon 2017 D-2: Schematic Design Summary
(2016-04-29)
Mission Statement; Detailed strategy for winning the competition including a contest-by-contest breakdown; Design drawings and/or written description of the following systems and components, with identification of any ...
Solar Decathlon 2017 D-1: 100 Word Description
(2016-03-31)
100 word description of team and goals for placement on Solar Decathlon website. First iteration.
Solar Decathlon 2017 D-3: Team Overview To Date
(2016-09-15)
Updated 100-word description of team and its goals (second iteration); Digital representation (renderings, graphic floor plan, photography of scale model, animation, etc.) of competition prototype design; Team photograph; ...