Search
Now showing items 1-4 of 4
Solar Decathlon 2017 D-8: Complete Cost Analysis
(2017-08-10)
The complete cost estimate is included. The estimate’s appropriateness, professionalism, and level of completion is reviewed by a professional cost estimator. This is the exact estimated construction cost the cost-effectiveness ...
Solar Decathlon 2017 D-8: Engineering Narrative
(2017-08-10)
Engineering design and implementation, including Team approach to employing multidisciplinary collaboration and use the energy modeling and analysis to guide design decisions; Design performance of systems and structures, ...
Solar Decathlon 2017 D-8: Communications Narrative
(2017-08-10)
Describes in-depth the efforts to educate, inform, and interest the public, including the communications strategy; success of outreach and education message; description of digital communications. The U.S. Department of ...
Solar Decathlon 2017 D-8: As-built specifications
(2017-08-10)
As-built specifications including construction specifications with sufficient detail for a residential general contractor to build without additional input from the team.