University of Maryland DRUM  
University of Maryland Digital Repository at the University of Maryland

DRUM >
Institute for Systems Research >
Institute for Systems Research Technical Reports >

Please use this identifier to cite or link to this item: http://hdl.handle.net/1903/6124

Title: Sequencing Wafer Handler Moves to Improve the Performance of Sequential Cluster Tools
Authors: Herrmann, Jeffrey W.
Nguyen, Manh-Quan T.
Department/Program: ISR
Type: Technical Report
Keywords: computer integrated manufacturing CIM, flexible manufacturing, manufacturing, cluster tools, scheduling, semiconductor manufacturing, Next-Generation Product Realization Systems
Issue Date: 2000
Series/Report no.: ISR; TR 2000-3
Abstract: Cluster tools are highly integrated machines that can perform a sequence of semiconductor manufacturing processes. The sequence of wafer handler moves affects the total time needed to process a set of wafers. Reducing this time can reduce cycle time, reduce tool utilization, and increase tool capacity. This paper introduces the cluster tool scheduling problem for sequential cluster tools and describes a branch-and-bound algorithm that can find an optimal sequence of wafer handler moves. In addition, we enumerate the set of 1-unit cyclic sequences for two- and three-stage sequential cluster tools. Experimental results show that the tool performance can be improved significantly if the wafer handler follows a cyclic sequence instead of using a dispatching rule.
URI: http://hdl.handle.net/1903/6124
Appears in Collections:Institute for Systems Research Technical Reports

Files in This Item:

File Description SizeFormatNo. of Downloads
TR_2000-3.pdf1.38 MBAdobe PDF143View/Open

All items in DRUM are protected by copyright, with all rights reserved.

 

DRUM is brought to you by the University of Maryland Libraries
University of Maryland, College Park, MD 20742-7011 (301)314-1328.
Please send us your comments. -
All Contents